Mechanical Spares Kit FSRTCHSPR

Specifications

  • Product Collection Spare Chassis Maintenance Options
  • Status Discontinued
  • Launch Date Q1'09
  • Expected Discontinuance 2012
  • Included Items Baffle for power supply-backplane, baffle for power supply-backplane, CPU ducts, power supply blank filler, RMM3 filler panel, I/O module filler panel, drive carriers, non-redundant fan structure, tape drive filler, CD tray with Standoffs

Supplemental Information

  • Description Mechanical Spares Kit

Ordering and Compliance

Retired and discontinued

Mechanical Spares Kit FSRTCHSPR, Single

  • Ordering Code FSRTCHSPR

Trade compliance information

  • ECCN EAR99
  • CCATS NA
  • US HTS 8473301180

PCN/MDDS Information

Compatible products

Intel® Server System SR1600UR Family

Product Name Status SortOrder Compare
All | None
Intel® Server System SR1600URHSR Discontinued
Intel® Server System SR1600URR Discontinued

Intel® Server System SR1625UR Family

Product Name Status SortOrder Compare
All | None
Intel® Server System SR1625URR Discontinued
Intel® Server System SR1625URSASR Discontinued

Intel® Server System SR2600UR Family

Product Name Status SortOrder Compare
All | None
Intel® Server System SR2600URBRPR Discontinued
Intel® Server System SR2600URLXR Discontinued
Intel® Server System SR2600URSATAR Discontinued

Intel® Server System SR2625UR Family

Product Name Status SortOrder Compare
All | None
Intel® Server System SR2625URBRPR Discontinued
Intel® Server System SR2625URLXR Discontinued
Intel® Server System SR2625URLXT Discontinued

Downloads and Software

Launch Date

The date the product was first introduced.

Expected Discontinuance

Expected Discontinuance is an estimate of when a product will begin the Product Discontinuance process. The Product Discontinuance Notification (PDN), published at the start of the discontinuance process, will include all EOL Key Milestone details. Some business units may communicate EOL timeline details before the PDN is published. Contact your Intel representative for information on EOL timelines and extended life options.